AccueilOffres d'emploiLeedsArchitectural Technologist
Torna alle offerte
⚡ Source: ReedRéf: 57003194

Architectural Technologist

Penguin Recruitment Ltd·Leeds·Publié il y a 1 mois
💰 35-45k CHF/an
Adapter mon CV à cette offre — Gratuit

Descrizione del posto

Texte original importé depuis Reed

Job Title: Architectural Technologist

Ref: BM190

Location: Leeds

Salary: £35,000 - £45,000

This is an excellent opportunity to join an established RIBA chartered practice who offer sustainable design services to the education, residential, and industrial sectors. They are on the lookout for an experienced Architectural Technologist to join their expanding team in Leeds.

Benefits for the role of Architectural Technologist include:

  • Highly competitive salary
  • Generous holiday allowance
  • Hybrid working
  • Contributory pension scheme
  • Professional development
  • Personal development

Duties for the role of Architectural Technologist include:

  • Lead on the technical delivery of projects across the defence, education, and industrial sectors
  • Work collaboratively with clients, consultants, and internal teams to achieve project goals
  • Produce detailed design documentation and technically robust packages
  • Ensure projects are delivered on schedule and within budget

Skills and experience for the role of Architectural Technologist:

  • Degree within Architectural Technology
  • Strong post qualification experience as an Architectural Technologist within a UK practice
  • Proficiency with Revit and experience working within BIM environments
  • Job running experience
  • Experience coordinating multidisciplinary teams
  • Strong technical knowledge and detailing skills
  • Excellent communication and organisational skills
  • Live within a commutable distance to the Leeds area

If This role interests you or if you are interested in searching for other roles relating to architecture please feel free to contact Ben Moore on or email . This is a permanent role

IA SpeedCV

Competenze chiave estratte

La nostra IA ha analizzato l'offerta per identificare le competenze richieste.

Compétences indispensables
Architectural Technology degreeRevitBIM environment experienceJob running experienceMultidisciplinary team coordinationTechnical detailingPost-qualification experience in a UK practice
Atouts supplémentaires
Sustainable design knowledgeDefence sector project experienceEducation sector project experience
Soft skills
CommunicationOrganisationCollaborationLeadershipAutonomy
IA SpeedCV

I nostri consigli per candidarsi

5 recommandations générées par notre IA pour maximiser vos chances.

1

⭐ Highlight your Revit proficiency prominently in your skills section — the advert lists it as a core requirement alongside BIM experience, making it a primary ATS filter.

2

📊 Quantify your project delivery experience: e.g. "Led technical delivery of 8 education-sector projects totalling £4.2M construction value, all completed on schedule and within budget."

3

🎯 Tailor your CV to reference at least two of the three named sectors (defence, education, industrial) — the advert specifically calls these out as the practice's focus areas.

4

🏗️ Include a dedicated 'Technical Skills' section listing BIM environments and Revit version experience, as the advert explicitly requires BIM environment proficiency alongside Revit.

5

🤝 Demonstrate job-running and multidisciplinary coordination experience with a concrete example — the advert lists both as distinct requirements, so treat them as separate CV bullet points rather than combining them.

NEW
IA SpeedCV

Bullets CV suggérés

3 bullets générés par notre IA pour cette offre, alignés sur ses mots-clés ATS.

Comment adapter votre CV

Ajoutez ces 3 bullets sous votre expérience la plus récente :

  • Led technical delivery of 6 education and industrial-sector projects in Revit, coordinating 4 external consultant disciplines and achieving RIBA Stage 4 issue within programme on all packages.
  • Produced technically robust BIM-compliant design documentation for a £3.8M defence-sector refurbishment, reducing RFI queries during construction by 30% through detailed pre-issue coordination.
  • Managed job-running responsibilities across 3 concurrent projects totalling £6M construction value, maintaining budget compliance and delivering all technical packages within agreed programme milestones.

Copier est gratuit — adapter nécessite un upload CV (30s).

NEW
Lettre IA

Votre lettre de motivation est prête

Nous avons rédigé une lettre pour Penguin Recruitment Ltd. Découvrez l'ouverture, puis débloquez la version complète personnalisée.

Aperçu — adapté à Penguin Recruitment Ltd

Dear Hiring Manager,

Penguin Recruitment's search for an Architectural Technologist at this RIBA chartered Leeds practice caught my attention immediately — the combination of Revit-led technical delivery across defence, education, and industrial sectors is precisely the environment in which I have built my career. The emphasis on BIM coordination and technically robust design packages aligns directly with the work I have been doing at RIBA Stage 3 and 4 level.

My background in architectural technology includes leading the technical delivery of multi-sector projects, producing detailed design documentation, and coordinating multidisciplinary consultant teams to keep programmes on schedule and within budget. I have extensive hands-on Revit experience within live BIM environments and a strong track record of job running from initial design through to construction issue.

Obtenir ma lettre personnalisée — gratuit

Inscription gratuite, sans carte. L'export PDF/Word nécessite l'essai 1,99 € (14 jours).

RISERVATO AI MEMBRI
IA SpeedCV

Domande probabili del colloquio

10 questions générées à partir de cette offre.

Tecniche

  • Walk us through your Revit workflow for producing a technically robust design package from RIBA Stage 3 through to Stage 4.
  • How do you manage BIM coordination across multidisciplinary teams, and what clash-detection processes have you used?
  • Describe your approach to technical detailing for an industrial or defence-sector project — what standards and regulations do you reference?
  • How do you ensure design documentation remains consistent and up to date when coordinating with external consultants?
  • What strategies do you use to keep projects on schedule and within budget during the technical delivery phase?

Comportamentali

  • Tell me about a time you led the technical delivery of a complex project and had to resolve a significant design coordination issue.
  • Describe a situation where you had to balance competing priorities across multiple projects simultaneously — how did you manage it?
  • Give an example of when you identified a technical error in a project package and how you resolved it before it affected the programme.
  • Tell me about a time you worked with a difficult client or consultant and how you maintained a productive working relationship.
  • Describe a project where sustainable design principles influenced your technical decisions and what the outcome was.
IA SpeedCVNEW

Exemples de réponses STAR

Réponses modèles avec la méthode Situation-Tâche-Action-Résultat. À adapter à votre vécu.

1Question

Tell me about a time you led the technical delivery of a complex project and had to resolve a significant design coordination issue.

Situation: On a £2.8M secondary school extension, a clash between the structural steel frame and the mechanical ductwork routes was identified at RIBA Stage 4, three weeks before the construction issue deadline. Task: As job runner, I was responsible for resolving the clash without delaying the programme or increasing costs. Action: I convened an emergency BIM coordination session with the structural and MEP consultants, used Revit's clash detection to map 14 conflict points, and proposed a revised duct routing strategy that the structural engineer approved within 48 hours. I then updated all affected drawing packages and reissued them. Result: The construction package was issued on the original date, the contractor raised zero RFIs related to that coordination zone, and the project completed on budget.
2Question

Describe a situation where you had to balance competing priorities across multiple projects simultaneously — how did you manage it?

Situation: I was simultaneously job-running three industrial and education projects, all of which reached their Stage 4 technical package milestones within the same four-week window. Task: I needed to maintain quality across all three without missing any deadlines. Action: I created a shared milestone tracker, allocated specific Revit model tasks to two junior technicians I was mentoring, and held brief daily check-ins to monitor progress. I prioritised the largest package — a £4.1M warehouse extension — for my own direct output and reviewed the others each evening. Result: All three packages were issued on time, the junior technicians developed their detailing skills noticeably, and the practice director cited the period as a benchmark for workload management in the team.

Offerte simili da scoprire

Voir toutes